The short answer
Why You Might Need a Variance
When a flood, fire, or storm damages your home, local codes may have changed since it was built. New rules might require a higher foundation, larger setbacks from property lines, or different materials. If your old home does not fit those rules, you cannot simply rebuild the same way without permission.
A variance request is that permission. It asks the local board to allow a specific deviation from the rules for your property. The board weighs your hardship against the intent of the code. You need to show that the strict rule creates an unnecessary burden, not just that you prefer the old design.
- Check your local building department for the application form
- Include site plans and photos of the damaged home
- Explain why the strict rule is a hardship for your property
- Attend the public hearing if one is scheduled
- Expect a decision in writing, usually within a few weeks
- Appeal the decision if you disagree, within the stated deadline
How a Variance Differs from a Permit
A building permit approves the actual construction work, such as wiring, plumbing, or structural changes. A variance is separate. It only addresses the zoning or code rule that your rebuild would violate. You may need both: first the variance, then the permit.
Sometimes your rebuild can meet current codes without a variance, especially if the damage is minor. If your home is substantially damaged, the rules often require you to bring the whole structure up to current standards. That is when a variance becomes a practical tool to keep the rebuild affordable and true to your home's original character.
Common Reasons Variances Are Granted
Local boards grant variances when the property has unique physical features, like a steep slope, a narrow lot, or a creek at the back. They also consider whether the variance would harm neighbors or the neighborhood. A variance is not a right; it is a case-by-case decision.
For water damage, a common variance is for flood elevation. If your home sits in a flood zone, the code may require the lowest floor to be higher than the old one. A variance might allow a lower elevation if raising the home is impractical or would ruin the home's connection to the street.
- Unusual lot shape or size
- Steep or unstable ground
- Existing structures that limit new construction
- Flood elevation that is physically impossible to meet
- Historic home features that would be lost
- Neighbor agreements that support the request
Steps to File a Variance Request
Start by calling or visiting your local building department. Ask for the variance application and any fee schedule. The process usually involves submitting a written request, site plans, and a description of the hardship. You may need to notify nearby property owners by mail.
The board then holds a public meeting where you present your case. They may ask questions about drainage, flood risk, or the home's history. After the hearing, they vote. If granted, the variance is recorded with the property, so it stays with the land even if you sell the home later.
What If Your Variance Is Denied
A denial is not the end. You can often appeal to a higher board or a local court, but that takes time and money. Before appealing, ask the board for the specific reasons. Sometimes a small change to your plan, like shifting the footprint a few feet, can solve the problem without a variance.
Also consider whether you can rebuild within the old footprint without a variance if the damage is below a certain threshold. Your local building official can tell you the substantial damage rules. If you live in Bellingham, keep your property records and old photos handy, as they help any request.
Need help right now?
Phones are answered 24/7 for Bellingham and nearby communities.
Call Now (360) 685-7801Frequently asked questions
How long does a variance request take?
The process typically takes a few weeks to a few months, depending on your local board's meeting schedule. It involves an application, a public hearing, and a written decision. Ask your building department for their current timeline when you submit.
Do I need a lawyer to file a variance?
No, many homeowners file on their own. The application is mostly paperwork and a short presentation. If the case is complex or the board denies you, you might seek help from a land use professional, but that is not required to start.
Does a variance affect my insurance claim?
A variance is about building rules, not insurance. Your insurance claim depends on your policy and the cause of damage. Policies vary, and your insurer decides what is covered. A variance does not change that, but rebuilding to code may affect future premiums.
More questions and answers
- How Do Structural Engineers Assess Post-Disaster Home Damage?
- How Do You Dispute a FEMA Denial for Disaster Assistance?
- How Do You Avoid Price Gouging After a Major Disaster?
- How Are Sentimental Items Handled During Disaster Restoration?
- What Is Pack-Out and Content Restoration After a Disaster?
- Can Disaster Restoration Work Be Tax Deductible for Homeowners?
- All articles